Playbook overview

Continuous work orchestration

Guide, operating model and reference

Suppose run 17 goes quiet halfway through the cancellation change. Its claim expires, so the scheduler gives the job to run 18. Five minutes later run 17 comes back with a patch and passing tests. Which run gets to update the work item? Would you throw away the first patch?

I’d keep the patch where someone can inspect it. Run 18 still owns the job. To make that decision stick, the team needs somewhere to record who approved the change, somewhere to record who currently holds the claim, and a build that can say which patch it checked. Those are the jobs behind the diagram.

In short. Start only approved work. Record which run holds the claim and check it wherever the result can change shared state. Start the next task when there’s room to review it.

The three planes

Three planes of continuous work orchestration.
Three planes of continuous work orchestration.
Open full-size diagram
Diagram in words

The work control plane authorises work. The orchestration plane claims it and starts sessions. Execution returns a result or decision to the orchestrator, which reports it to the work control plane.

In our example the tracker still holds the booking owner’s approval. The orchestrator’s saved claim names run 18, even if both sessions think they’re working on the task. Git can keep both revisions. When a result comes back, the protected build identifies the revision it checked and the service accepting the result checks that its run still owns the work.

A support message, failing build or trace is a signal. It can point to a task worth looking at. The shared work record and its approval policy decide whether a session may start or change behaviour. Give people a way to turn a signal into proposed work, then let normal triage decide priority.

Work orchestration and task orchestration

The work orchestrator stays available across tasks. It needs priorities, dependencies, capacity, claims and decisions. It can restart because its state is stored outside the conversation.

Task orchestration works out how to deliver one approved task. Start a fresh session with the repository revision, spec, permitted tools, scope and checks. In the small case, that session can go straight from investigation to implementation. For a larger piece of work, it may coordinate separate bounded tasks or ask for an independent review. Start those in fresh contexts when the tools, access or judgement differ. There’s no standing “booking agent” in the worked example.

OpenAI’s Symphony is a public example of connecting a work tracker to an orchestrator that starts and replaces task runs. Shopify describes a different setup that preserves state outside the processes doing the work. For a team already losing time picking up interrupted changes, the first thing I’d borrow is the handoff attached to the work item. I’d try closing one session halfway through and asking another engineer to carry on from the saved revision. If that deals with the interruptions and someone is still happy to start each job, I’d leave scheduling there. Symphony · Under the River

Make readiness a grant of authority

Task authority from readiness to acceptance.
Task authority from readiness to acceptance.
Open full-size diagram
Diagram in words

Ready for Agent advances to Agent In Progress after a claim, then to Agent Verification with a candidate. Required checks must pass before Ready for Review. An approver accepts the result. Active work can move to Requires Human and return to Ready for Agent after an authorised decision.

These labels are examples. Use your tracker’s equivalent states and enforce the same transitions.

StateWho or what moves the task thereWhat it means
Ready for AgentAn authorised owner or explicit policyScope, owner, dependencies, acceptance and approval are known. The task may be claimed. Pin the approved spec and policy revisions, and the verification contract where required.
Agent In ProgressThe orchestrator, after a successful claimOne current run may work within the agreement. Store the run identity, claim expiry and saved progress.
Agent VerificationThe orchestrator, after receiving an eligible candidate revisionRequired checks are in progress. The session’s summary is useful context. Protected checks supply the evidence.
Ready for ReviewA trusted transition after independent verificationRequired results match the approved spec, policy, run where applicable, and exact code/build. A stale or inconclusive required result keeps the task out of review.
Requires HumanAn operator, verifier or session through a controlled transitionA decision outside delegated authority is blocking the work. Save the evidence, the question and the next step. Stop the run from making authoritative writes.
AcceptedThe authorised reviewer or an explicit acceptance policyThe evidence and any human decision satisfy the acceptance policy. Authorise release separately when the team requires it.

A failed check can go back to implementation within the retry policy. An unresolved requirement, permission exception or conflicting expectation goes to Requires Human. A person can make that work eligible again after resolving the decision and approving any amended brief. The next session reads the new approval and saved revision.

Follow a task from approval to acceptance

  1. Work tracker. A person or policy approves the task, clears dependencies and records the exact specification and checks that apply.
  2. Persistent orchestrator. It atomically claims the eligible task and chooses an available execution slot. Its saved claim says which run can submit a result.
  3. Execution pool. A fresh session takes the approved brief into an isolated checkout and leaves a candidate revision in Git. A replacement can use the saved handoff.
  4. Git and protected verification. Git identifies the exact code. A trusted job verifies that revision against the approved contract and returns the evidence to the orchestrator.
  5. Human approval. Where policy requires it, the reviewer uses the evidence to accept the result. An open decision goes back to Requires Human. The tracker records the outcome.
An approved task from the tracker to human acceptance.
An approved task from the tracker to human acceptance.
Open full-size diagram
Diagram in words

The work tracker supplies the approved task. The orchestrator claims it and starts a fresh session. The session saves a Git revision. Protected verification sends evidence to the orchestrator for human review. The decision returns to the work tracker.

Discover, claim and recover

Have a readiness or dependency event wake the orchestrator. Also reconcile periodically with the tracker, run store, Git and build system. A missing event should delay work until the next sweep. Duplicate events should lead to the same eligibility and claim check.

Claim in one operation that checks approval, dependencies, readiness and current ownership. Make the claim expire if the run stops renewing it. When a task is recovered, give the replacement run a new generation and check that generation wherever shared writes are accepted. A late submission from a previous run can contain a useful patch. It cannot replace the current result. Worked claim, handoff and guarded writes

With several orchestrators, use the same claim rules and records. Give each task an owner and a clear dependency order. Start independent work in parallel if the team can review it. A session can record an unrelated improvement for triage. Authorisation to work on that improvement comes from the work control plane.

Make room for review

Say two booking changes are ready for review and the only person who knows the cancellation rules is already waiting for a policy decision on one of them. Starting a third change gives that person more to read. I’d agree how much work the available reviewers can take and give the dispatcher a limit for open work headed to those reviewers. Include work in progress and work returned for corrections, so a run already on its way to review counts against the limit.

When the limit is reached, pause new starts for that queue and decide whether someone can pick up a review, answer a blocking question or split a change that is too broad to check. A diff budget can help start that conversation. Look at how many behaviours or boundaries changed as well as how many lines moved. A small permission change can take longer to review than a big mechanical rename.

Faros observed longer review times when it compared periods of lower and higher AI adoption across organisations on its platform. I’d use that as a reason to look at the local queue and adjust the limit when the team has seen a few changes through to acceptance. Faros 2026 findings · Starter scorecard

Make the delivery system observable

Put the state people will act on where they can see it. Start with time from eligibility to claim, expired claims, work waiting on a person, verification failures by cause, and age of items ready for review. Track retries, time and spend against the accepted changes they contribute to. An empty execution queue tells you little if the review queue is growing all week.

Try missed events, competing claims, an expired run returning late, and a requirement change while verification is running. See harness evaluations and the worker recovery trial.