Playbook overview

Task and review notes

Guide, operating model and reference

Copy the parts your change needs. For a small change, a short brief and a link to the build may be enough.

Task brief

  • Owner — who can make a decision about this work?
  • Outcome — what should be different when the change is complete?
  • Scope — which behaviour can change? What should the worker preserve?
  • Acceptance — give examples of what should happen, especially at the boundaries.
  • Working limits — where may the worker run, what access may it use, and when should it stop?
  • Approved revision — link to the brief or specification agreed for this change.

If the run needs machine-readable scope, permissions or stop conditions, use the YAML task contract. Give it a link to the approved verification contract below.

Verification contract

Use this when an unattended job or a consequential change needs a record the team can approve before work begins. Refer to the approved brief rather than rewriting it.

  • Approved inputs — immutable references for the brief, the verification policy and any protected fixtures or models the checks use.
  • Decision owner — who approved the requirements and who can approve a change to them?
  • Required checks — give each check an ID, the requirement it covers, the method and the evidence expected. Record why stronger checks are needed and what is outside their scope.
  • Acceptance rule — where are the checks run, what result allows work to proceed, and what still needs human approval?

For an automated check, derive the record from the approved brief and policy where possible. This illustrative YAML shows the fields a verification job could read for the cancellation change. The revision values and artefact names are examples.

change: booking-cancellation
approved_spec: "<approved-git-commit>"
verification_policy: "<protected-policy-commit>"
assurance:
  level: enhanced
  reason: Changing a time boundary and preserving terms for old bookings
required_checks:
  - id: C01
    method: domain-test
    expected: Accept cancellation at exactly 24 hours
  - id: C02
    method: domain-test
    expected: Refuse cancellation inside the cutoff
  - id: C03
    method: integration-test
    expected: Existing bookings retain their previous terms
  - id: C04
    method: integration-test
    expected: Repeated requests result in one cancellation event
  - id: V01
    method: representative-journey
    expected: Confirmation, displayed deadline and refusal explain the same policy
completion:
  require_all: true
  evidence_source: independent-verifier
  acceptance: authorised-reviewer
exclusions: [live payment integration]

For a real job, point to immutable revisions or digests, and give each check an evidence location. The verifier records the tested code and build identity in its result. Use the team’s normal approval path for release.

Verification record

  • Code and build identity, the approved brief, policy and contract revisions, and the current run or claim where relevant
  • Result for each required check, with links to evidence and the environment or tool versions needed to interpret it
  • Checks not run and assumptions, including gaps a reviewer should know about
  • Review decision or open question, with the person who owns it

The worker sends its notes and candidate revision. This is an example of the shorter record the independent job and the approved human walkthrough could contribute to. The job stores its output somewhere the worker cannot overwrite.

change: booking-cancellation
approved_spec: "<approved-git-commit>"
verification_policy: "<protected-policy-commit>"
contract_revision: "<approved-contract-commit>"
source_revision: b82f615  # illustrative revision for build 42
build: test-build-42
run: run-18
checks:
  C01: {result: pass, evidence: fixed-clock-boundary-result}
  C02: {result: pass, evidence: inside-cutoff-result}
  C03: {result: pass, evidence: legacy-booking-fixture-result}
  C04: {result: pass, evidence: repeated-request-integration-result}
  V01:
    result: pass
    evidence: walkthrough-build-42-record-01
    actor: example-qa-reviewer
    observed_at: "2026-11-18T11:42:00Z"
    environment: isolated-test-build-42
acceptance:
  state: pending
  owner: example-policy-owner
exclusions: [live payment integration]
gate: pass
next: authorised review

This is the corrected build. The booking review also records why build 41 stopped at V01. On a real run, use durable evidence links or artefact identifiers and name who ran the manual check. A missing, stale or inconclusive required result blocks the move to review. A pass can make the work eligible for review while acceptance is still pending.

If the work needs a decision

State the decision needed, show what you found, and explain what each available option would change. Leave a link to the current work so someone can pick it up after the decision.